This project was built by England building Co. from Portland. The mechanical system installed is a Mitsubishi Electric City Multi System with 27 x ceiling cassette units interlocked with Losnay fresher systems. Each room has complete individual control, which makes this a very energy efficient building.

This system was designed by BRT Engineering.